Ship Equipment Repair and Maintenance Services
Ship Equipment Repair and Maintenance Services
Comprehensive Marine Solutions Designed for Safety, Strength, and Performance

Comprehensive Marine Solutions Designed for Safety, Strength, and Performance

Our team has over ninety-two (92) combined years of experience servicing ships.
We service
We can also offer quick turn-around on reverse engineered components for machined/fabricated items that have long lead times and are many times overly expensive.

Our Team is regularly on board the Holland America Line vessels. We have serviced the ships in all parts of the world.
We have received and repaired vital equipment components in an expedited manner to lessen down time.
Services include hydraulic cylinder overhaul and replacement, onsite windlass brake cylinder overhaul, mooring winch repairs, fairlead roller replacements/upgrades, and side door repairs.

Our teams have provided services on all four of the Disney Vessels. Our services included the installation of Lifting Arrangements for Main Engine disassembly, Exhaust Fan Removal/Installation and Carrier AC Compressor overhauls.

Our Team Members have serviced a number of the CCL Vessels. The services included Life Boat Exhaust Piping Replacement, Fire Door Replacement and Mooring Equipment maintenance.
Currently, we are in talks with the Management to service the fleet wide Window Washing Robots.

Services provided by our team members in the past has included services such as Chain Stopper Roller Shaft Replacement, Fair Lead Roller Upgrades, Windlass Brake Lining Replacement and Mooring Winch Gearbox Inspection.

Trusted by one of the industry’s best luxury cruise lines. Our Team has preformed repairs/overhauls on the mooring equipment, sail booms, structural repairs and replacement of access platforms. Manufactured and provided special brackets to mount and lift gangways.

Services provided by our team members has included services as Brake Lining Replacement and Mooring Winch Gearbox Inspections. Brake Tie Plate Replacement.

Services provided by our team members in the past has included services such as Fire Door Repairs, Mooring Equipment Inspection and Class A overhaul of the ships Window Washing Equipment.

Our partnership with Maersk Line Limited has become one of our primary accounts. We have been in ports around the world for inspections and services. We have been able to accommodate emergency repairs on all 3 USA Coast Lines on a last minute phone call.

Lindbald Expeditions
Lindbald Expeditions (National Geographics) has become one our primary clients. Our services have proved to be instrumental to their operations. We have designed and installed components for the release of small boat fuel tank jettison, fair lead rollers to prevent chaffing of the mooring lines and upgraded and replaced the knuckle cranes.
Under our CNC milling and turning capabilities, we offer a comprehensive package of machining services which include but are not limited to the following:
1. Machining of Numerous Parts:
2. Other Miscellaneous Services:
Business: (864) 534-4300 Email Us: clinch@shipwrightmarineservices.com